Mixed-in-Place and Cutter-Soil-Mixing

Why haul away soil and bring in new materials when the soil can be used for construction? The Mixed-in-Place(MIP)- and Cutter-Soil-Mixing(CSM)-methods developed by the BAUER Group avoid the need for labour-intensive transport coordination, cut costs, reduce emissions and so relieve the strain on residents in the neighbourhood. Both methods offer efficient, cost-effective and environmentally friendly alternatives in the appropriate ground.

Mixed-in-Place Details

Cutter-Soil-Mixing Details

"Mixed-in-Place for dams and dykes" Technique Brochure

 

Mixed-in-Place Fischen Allgäu Mixed-in-Place Deichsanierung Geisslitz Mixed-in-Place Weissenkirchen
Mixed-in-Place Pasing Arkaden München Deutschland Mixed-in-Place Hochwasserschutz Mauthausen Österreich Mixed-in-Place Neu-Ulm Deutschland
Mixed-in-Place Stockstadt Deutschland Mixed-in-Place Schweinfurt Deutschland Mixed-in-Place Obere Iller